Mon–Sat: 8:00 AM–4:30 PM Emergency service on request WhatsApp
Installation

Professional installation & setup.

Correct placement, levelling, water, drainage and electrical setup for front-load, top-load and washer-dryer machines in homes and business environments.

Washing machine technician carrying out a professional repair on a front-load machine
Installation process

A good installation prevents avoidable faults.

1
Site assessmentCheck placement, water supply, drain position, floor stability and electrical connection.
2
Levelling & vibration controlSet adjustable feet correctly and confirm the machine sits stable on the floor.
3
Water, drain & powerConnect inlet, drain and power safely with suitable fittings and routing.
4
First-run testingCheck fill, drain, spin, leaks and relevant machine functions before handover.
5
Customer handoverExplain loading, detergent, filter care and basic maintenance.
Washing machine technician carrying out a professional repair on a front-load machine
Payment & service

Practical support for Tanzanian households and businesses.

The original service information includes cash, card and mobile-money payment options such as M-Pesa, Tigo Pesa and Airtel Money. Confirm the available method when the booking is scheduled.

Front load

Stable, level installation

Particularly important for high-speed spin cycles and vibration control.

Top load

Water & drain routing

Correct inlet pressure, hose placement and drainage help reliable cycle operation.

Washer-dryer

Combined function checks

Installation should account for the full operating requirements of the model.

Call WMDBook service